MiniMax M3.1 Flash 428B · Chip comparison

MiniMax M3.1 Flash 428B — H100 vs H200

Head-to-head AI inference benchmark comparison of H100 (NVIDIA Hopper) and H200 (NVIDIA Hopper) on MiniMax M3.1 Flash 428B. Latency, throughput, and cost across LLM workloads. Use the chart controls below to switch sequences, precisions, and metrics — same interactions as the main inference chart.

AgentX replays real coding-agent sessions rather than fixed-length prompts, so context grows turn over turn and most of each request is served from cache instead of being recomputed. That turns the comparison into a systems question: KV transfer between nodes, prefix-aware routing, and cache capacity all move the curve alongside raw chip throughput. Fixed-sequence workloads stay the clean baseline for kernel and silicon performance, so the two scenarios answer different questions about the same hardware. Learn more about AgentX →

At 84 tok/s/user interactivity on MiniMax M3.1 Flash 428B, H100 delivers 5,732 tok/s/chip at $0.057 per million tokens; H200 delivers 9,779 tok/s/chip at $0.035. H200 is 39% cheaper per token; H200 delivers 71% more tok/s/chip at this point.

H100 posts 4,486 tok/s/chip for $0.072 per million tokens at 152 tok/s/user on MiniMax M3.1 Flash 428B; H200 posts 7,133 tok/s/chip for $0.048. H200 is 34% cheaper per token; H200 delivers 59% more tok/s/chip.

Throughput at 220 tok/s/user on MiniMax M3.1 Flash 428B: H100 hits 3,595 tok/s/chip, H200 hits 4,350. Costs per million tokens land at $0.090 and $0.078 respectively. H200 is 14% cheaper per token; H200 delivers 21% more tok/s/chip. (Numbers reflect the default agentic-traces · fp4 selection for this URL — table and chart below update if you change sequence, precision, or model in the controls.)

View performance per dollar →

Interpolated from real benchmark data. Edit target interactivity values below to compare at different operating points.

Metric
Interactivity (tok/s/user)
Interactivity (tok/s/user)
Interactivity (tok/s/user)
Throughput (tok/s/chip)
H1005,732H2009,779
H1004,486H2007,133
H1003,595H2004,350
Cost ($/M tok)
H100$0.057H200$0.035
H100$0.072H200$0.048
H100$0.090H200$0.078
tok/s/MW
H1004,184,237H2007,137,724
H1003,274,527H2005,206,434
H1002,623,785H2003,175,543
Concurrency
H100~9H200~15
H100~7H200~10
H100~3H200~5