GLM 5.3 744B · Chip Comparison

GLM 5.3 744B — B300 vs Trainium3

Head-to-head AI inference benchmark comparison of B300 (NVIDIA Blackwell) and Trainium3 (AWS Trainium3) on GLM 5.3 744B. Latency, throughput, and cost across LLM workloads. Use the chart controls below to switch sequences, precisions, and metrics — same interactions as the main inference chart.

AgentX replays real coding-agent sessions rather than fixed-length prompts, so context grows turn over turn and most of each request is served from cache instead of being recomputed. That turns the comparison into a systems question: KV transfer between nodes, prefix-aware routing, and cache capacity all move the curve alongside raw chip throughput. Fixed-sequence workloads stay the clean baseline for kernel and silicon performance, so the two scenarios answer different questions about the same hardware. Learn more about AgentX →

B300 / Trainium3 on GLM 5.3 744B at 149 tok/s/user: 14,145 / 21,955 tok/s/chip, $0.044 / $0.011 per million tokens. Trainium3 is 76% cheaper per token; Trainium3 delivers 55% more tok/s/chip.

Around the middle of the 90–327 tok/s/user interactivity band, at 209 tok/s/user on GLM 5.3 744B: B300 runs 9,458 tok/s/chip at $0.066 per million tokens, Trainium3 runs 13,602 at $0.017. Trainium3 is 74% cheaper per token; Trainium3 delivers 44% more tok/s/chip.

Setting 268 tok/s/user as the target on GLM 5.3 744B, B300 produces 5,145 tok/s/chip ($0.12 per million tokens) and Trainium3 produces 6,985 ($0.033). Trainium3 is 73% cheaper per token; Trainium3 delivers 36% more tok/s/chip. (Numbers reflect the default agentic-traces · fp4 selection for this URL — table and chart below update if you change sequence, precision, or model in the controls.)

View performance per dollar →

Interpolated from real benchmark data. Edit target interactivity values below to compare at different operating points.

Metric
Interactivity (tok/s/user)
Interactivity (tok/s/user)
Interactivity (tok/s/user)
Throughput (tok/s/chip)
B30014,145Trainium321,955
B3009,458Trainium313,602
B3005,145Trainium36,985
Cost ($/M tok)
B300$0.044Trainium3$0.011
B300$0.066Trainium3$0.017
B300$0.12Trainium3$0.033
tok/s/MW
B3007,444,500Trainium32,197,701
B3004,978,037Trainium31,361,580
B3002,707,959Trainium3699,164
Concurrency
B300~8Trainium3~556
B300~11Trainium3~183
B300~1Trainium3~137